Need an EV charger at your Muswell Hill home? Tired of searching for public chargers? Want faster overnight charging? We install smart home installation 7kW EV chargers — fully certified, app-controlled, and ready to charge your electric vehicle safely at home.
✓7kW Smart Chargers
✓Full Installation
✓App Controlled
✓12-Month Warranty
Installations from
From £1,499
Starting Price Includes:
7kW Smart Charger • Full Installation
Certification • 12-Month Warranty
Why Choose Rudi Electrics for EV Charger Installation Muswell Hill?
Your concerns answered — here’s why Muswell Hill EV drivers trust us for home charging installations.
🔌
“Can my home’s electrical system handle an EV charger?”
Full electrical assessment included. We check your consumer unit upgrade capacity, incoming supply, and earthing system before installation. If upgrades are needed, we’ll quote them upfront — most modern homes are ready without changes.
💷
“How much will it cost and what’s included?”
Fixed price quote after free survey. We assess your property, measure cable routes, and provide a detailed written quote covering charger unit, installation, testing, and certification. No hidden extras — the price we quote is what you pay.
🏠
“Where will the charger be positioned and how will cables be routed?”
Site survey with optimal placement planning. We assess cable routes, parking positions, and aesthetics during our free survey. Cables are hidden where possible using conduit or trunking, and we always check with you before drilling.
⚡
“What charging speed will I actually get at home?”
7kW fast charging as standard. Most home installations provide 7kW (0-80% overnight for typical EVs). We’ll recommend the right charger for your vehicle and usage, and explain realistic charging times based on your car’s battery size.
Muswell Hill N10 is our home base and one of our most active EV charger installation areas. The large Victorian and Edwardian villas on Muswell Hill Road, Tetherdown, and Pages Lane have substantial driveways and garages — perfect for EV charger installation. The area’s affluent, environmentally-conscious demographic has driven strong EV uptake, and we install home chargers here regularly for residents who’ve switched from premium petrol to premium electric.
Muswell Hill’s larger Victorian properties sometimes require longer cable runs from the consumer unit to the driveway — we plan this carefully to keep cabling neat and minimally visible. As fully qualified electricians, we install all major brands including Ohme, Hypervolt, and Easee. For other electrical work in Muswell Hill, see our electrician Muswell Hill page.
Professional EV charger installation from start to finish. Most installations completed in 3-4 hours on the same day with full certification.
1
📋
Free Site Survey
We visit your property to assess your electrical system, check meter capacity, and determine the best charger location. We’ll discuss your requirements and provide a detailed fixed-price quote.
⏱️ 30-fast response time
2
🔌
Pre-Installation Checks
On installation day, we verify your consumer unit upgrade capacity and earthing arrangements. If any upgrades are needed (e.g., new consumer unit), we’ll discuss this before proceeding.
⏱️ 15-20 minutes
3
🔧
Cable Installation
We run dedicated armoured cable from your consumer unit upgrade to the charger location. Cables are surface-mounted or buried as required, with proper cable protection throughout.
⏱️ 1-2 hours
4
⚡
Charger Mounting
The EV charger is securely mounted on your chosen wall (typically garage, driveway, or house wall). We ensure it’s weatherproof, at the correct height, and positioned for easy cable access to your vehicle.
⏱️ 30-fast response time
5
🔍
Testing & Commissioning
We carry out comprehensive electrical testing including earth fault loop impedance, insulation resistance, and RCD operation. The charger is commissioned and tested with your vehicle if present.
⏱️ 30 minutes
6
📱
Setup & Certification
We help you set up the smartphone app, explain all features, and demonstrate how to charge your vehicle. You receive your electrical installation certificate and warranty documents.
⏱️ 15-20 minutes
🔌
Ready to Install Your EV Charger?
Get a free site survey and fixed-price quote — most installations completed in 3-4 hours
Tell us about your parking and charging needs — we’ll get back to you within 24 hours with a fixed price quote.
🎓
fully qualified Approved Installer
NICEIC registered and fully qualified-compliant installations — fully certified to current regulations including EV-specific Part P.
⚡
Same-Day Installation
Most EV charger installs complete in a single day — certificate and app set-up included, no return visits needed.
🔒
Smart & Future-Proof
WiFi-enabled chargers with app control, smart scheduling, and solar integration ready — future-proof your home.
💰
From £1,499
Fixed price installations from £1,499 — price agreed before work starts, no hidden extras.
Muswell Hill N10/N10: Most installations are straightforward one-day jobs. Properties with long cable runs to rear garages may need SWA armoured cable — assessed and included in your fixed quote. DNO notification handled as standard.
Sending your enquiry…
⚠ Something went wrong. Please call us on 07932 772050 instead.
🔒 Your details are kept private and never shared. We’ll call within 24 hours.
✓
Enquiry Sent!
Thanks — we’ll call you within 24 hours to arrange your free site survey and fixed price quote.
EV Charger Installation Muswell Hill — Across All Property Types
From the large Victorian villas of Muswell Hill Road to the 1930s semis of Fortis Green — we install home EV chargers across Muswell Hill N10.
🏛️
Victorian & Edwardian Villas
📍 Muswell Hill Road, Colney Hatch Lane, Tetherdown, Pages Lane
⚠ COMMON SITUATION:
Muswell Hill’s large Victorian villas often have long driveways and garages — ideal for home EV charging. Older consumer units need capacity assessment and sometimes upgrading before a 7kW charger can be safely added.
⚡ OUR APPROACH:
Full survey for Muswell Hill villas — board capacity confirmed, optimal charger location agreed, any required upgrade quoted upfront. Clean installation with minimal disruption to period features. fully qualified electricians approved, grant paperwork handled.
The Fortis Green area semis — front driveways are common and EV charger installation is straightforward. One of the most frequent installation types we complete in Muswell Hill.
⚡ OUR APPROACH:
Standard Muswell Hill semi installation — survey, fixed price, installed within days. fully qualified electricians grant up to £350 applied. 7kW smart charger with full app setup and test charge before we leave.
🏢
Purpose-Built Flats & Mansion Blocks
📍 Alexandra Palace Way, Muswell Hill Broadway, Elms Avenue
⚠ COMMON SITUATION:
Flat EV installations in Muswell Hill require lease review and freeholder consent. Mansion blocks around the Broadway may have communal car park charging options that are worth investigating first.
⚡ OUR APPROACH:
Muswell Hill flat EV consultation — we assess communal charging options, review lease requirements, and advise on individual installation feasibility before anything is ordered. Full installation once consent is confirmed.
🏗️
Extended Properties & Solar Homes
📍 Throughout Muswell Hill N10 — extensions, loft conversions, side returns
⚠ COMMON SITUATION:
Muswell Hill has a high proportion of solar panel owners — the myenergi Zappi is the ideal charger for charging from solar surplus. We’re Zappi specialists and official myenergi partners.
⚡ OUR APPROACH:
Zappi solar EV charger installation — CT clamp fitted on solar circuit, all three charge modes (Fast/Eco/Eco+) configured and demonstrated. fully qualified electricians approved installation. Best partner pricing on Zappi hardware.
How much does EV charger installation cost in Muswell Hill?
▼
Standard 7kW smart charger installation costs From £1,499 including the charger unit, installation up to 5m cable run, WiFi setup, and full certification. Premium 7kW chargers with advanced features cost From £1,799 with installation up to 15m. Custom installations for three-phase, commercial setups, or multiple charging points are priced individually after our free site survey.
How long does EV charger installation take in Muswell Hill?
▼
Most standard installations complete in 3-4 hours on the same day. This includes mounting the charger, running the dedicated circuit from your consumer unit, cable protection, WiFi configuration, full testing, and certification. Complex installations requiring consumer unit upgrades or long cable runs may take longer.
Do Muswell Hill properties need a consumer unit upgrade for an EV charger?
▼
Many older properties need a consumer unit upgrade to safely support EV charging. During our free site survey, we assess your electrical capacity, check for spare ways, and verify your earthing arrangements. Modern consumer units with RCD protection and spare capacity can usually accommodate a 7kW charger without modification. We’ll provide a clear recommendation and fixed price if upgrades are needed.
What’s included in the installation price?
▼
Everything you need: smart charger unit, secure wall mounting, dedicated 40A circuit installation from consumer unit, protective armoured cable or conduit, WiFi configuration and app setup, full electrical testing to BS7671 standards, Electrical Installation Certificate, DNO notification where required, and 12-month workmanship guarantee. The only additional costs are consumer unit upgrades (if needed) or cable runs beyond the included length.
Can I charge any electric vehicle?
▼
Yes! Our 7kW chargers use the universal Type 2 connector, compatible with all modern electric vehicles and plug-in hybrids sold in the UK—including Tesla (with adapter), Nissan Leaf, BMW i3, VW ID.3/ID.4, Hyundai Kona, Kia e-Niro, MG ZS EV, and all other current models. We’ll confirm compatibility during your free site survey.
Do you install chargers for flats and apartments?
▼
Yes, but installation depends on having dedicated parking with access to your own electrical supply. We can install chargers in underground car parks, allocated parking bays, or private driveways serving flats. You’ll typically need written permission from your building management or freeholder. We provide full documentation and technical specifications to support your application, and coordinate with managing agents for smooth installation.
How does smart charging work?
▼
Smart chargers connect to WiFi and control charging via smartphone app. You can schedule charging during off-peak hours (saving money with cheaper night-time electricity rates), monitor energy usage in real-time, receive notifications when charging completes, and track charging history. Premium models offer solar integration to charge using excess solar panel energy, and load balancing to prevent overloading your home’s electrical system.
Do I need planning permission?
▼
Most home EV charger installations are “permitted development” and don’t require planning permission in England. However, listed buildings, properties in conservation areas, or certain leasehold flats may need approval. We recommend checking with your local planning authority if unsure. All our installations comply with Building Regulations Part P and come with proper electrical certification regardless of planning requirements.
How fast will my car charge at home?
▼
Our standard 7kW chargers typically add 25-30 miles of range per hour of charging. Most EVs charge from empty to 80% overnight (6-8 hours). For example: a Nissan Leaf charges fully in 7 hours, Tesla Model 3 in 8 hours, VW ID.3 in 9 hours. Exact charging times depend on your vehicle’s battery size and onboard charger capacity. We’ll provide specific estimates for your vehicle during the site survey.
What warranty do you provide?
▼
All installations include our 12-month workmanship guarantee. Standard chargers have 3-year manufacturer warranties, while premium models come with 5-year warranties. As NICEIC registered electricians covering Muswell Hill N10, N10, if you experience any issues with the installation, we’ll return promptly to resolve them at no additional cost during the guarantee period.
What if my driveway is far from my consumer unit?
▼
Standard installation includes up to 5m cable run (15m for premium packages). For longer distances, we install armoured cable via external walls, underground ducting, or through garages. Cable runs over 15m incur additional costs based on distance and complexity. During the free site survey, we’ll measure the exact route and provide transparent pricing for any additional cabling required.
How do I book an EV charger installation?
▼
Call us on 07932 772050 or use our online booking form. We’ll arrange a free site survey at a convenient time, assess your property’s electrical capacity, discuss charger options and features, and provide a detailed fixed-price quote with no obligation. Most installations are completed within 1-2 weeks of survey.
function scrollToBookingEVSection(event) {
event.preventDefault();
// Find the booking area
const bookingArea = document.getElementById(‘booking-area’);
if (bookingArea) {
// Simple smooth scroll to booking area
bookingArea.scrollIntoView({
behavior: ‘smooth’,
block: ‘start’
});
}
}
document.addEventListener(‘DOMContentLoaded’, function() {
var faqItems = document.querySelectorAll(‘.re-faq-ev-item’);
// Auto-collapse all FAQs after 2 seconds (gives Google time to crawl)
setTimeout(function() {
faqItems.forEach(function(item) {
item.open = false;
});
}, 2000);
// Click to toggle individual FAQs
faqItems.forEach(function(item) {
item.addEventListener(‘toggle’, function() {
if (this.open) {
// Close other FAQs when one opens
faqItems.forEach(function(otherItem) {
if (otherItem !== item && otherItem.open) {
otherItem.open = false;
}
});
}
});
});
});
[
{
“@context”: “https://schema.org”,
“@type”: “FAQPage”,
“mainEntity”: [
{
“@type”: “Question”,
“name”: “How much does EV charger installation cost in Muswell Hill?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “EV charger installation in Muswell Hill N10 starts from u00a31,499 for a standard BG Sync Energy 7kW charger including all wiring, consumer unit assessment, and DNO notification. Properties requiring longer cable runs or additional circuit work are quoted individually. Fixed price confirmed before starting u2014 no hidden extras.”
}
},
{
“@type”: “Question”,
“name”: “How long does EV charger installation take in Muswell Hill?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Most Muswell Hill EV charger installations take 3u20135 hours. Properties with a rear garage requiring armoured cable from the consumer unit to the charger may take a full day. We confirm the exact scope and timing at the initial survey u2014 carried out free of charge before any work begins.”
}
},
{
“@type”: “Question”,
“name”: “Do Muswell Hill properties need a consumer unit upgrade for an EV charger?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Many Muswell Hill N10 properties have older consumer units with limited spare capacity. We assess this at the free survey u2014 if an upgrade is needed, we’ll include it in your quote. Most modern consumer units have sufficient capacity for a 7kW charger without requiring an upgrade.”
}
},
{
“@type”: “Question”,
“name”: “What’s included in the installation price?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Everything you need: smart charger unit, secure wall mounting, dedicated 40A circuit installation from consumer unit, protective armoured cable or conduit, WiFi configuration and app setup, full electrical testing to BS7671 standards, Electrical Installation Certificate, DNO notification where required, and 12-month workmanship guarantee.”
}
},
{
“@type”: “Question”,
“name”: “Can I charge any electric vehicle?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Yes! Our 7kW chargers use the universal Type 2 connector, compatible with all modern electric vehicles and plug-in hybrids sold in the UKu2014including Tesla (with adapter), Nissan Leaf, BMW i3, VW ID.3/ID.4, Hyundai Kona, Kia e-Niro, MG ZS EV, and all other current models.”
}
},
{
“@type”: “Question”,
“name”: “Do you install chargers for flats and apartments?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Yes, but installation depends on having dedicated parking with access to your own electrical supply. We can install chargers in underground car parks, allocated parking bays, or private driveways serving flats. You’ll typically need written permission from your building management or freeholder.”
}
},
{
“@type”: “Question”,
“name”: “How does smart charging work?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Smart chargers connect to WiFi and control charging via smartphone app. You can schedule charging during off-peak hours (saving money with cheaper night-time electricity rates), monitor energy usage in real-time, receive notifications when charging completes, and track charging history. Premium models offer solar integration and load balancing.”
}
},
{
“@type”: “Question”,
“name”: “Do I need planning permission?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Most home EV charger installations are permitted development and don’t require planning permission in England. However, listed buildings, properties in conservation areas, or certain leasehold flats may need approval. All our installations comply with Building Regulations Part P and come with proper electrical certification.”
}
},
{
“@type”: “Question”,
“name”: “How fast will my car charge at home?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Our standard 7kW chargers typically add 25-30 miles of range per hour of charging. Most EVs charge from empty to 80% overnight (6-8 hours). For example: a Nissan Leaf charges fully in 7 hours, Tesla Model 3 in 8 hours, VW ID.3 in 9 hours.”
}
},
{
“@type”: “Question”,
“name”: “What warranty do you provide?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “All installations include our 12-month workmanship guarantee. Standard chargers have 3-year manufacturer warranties, while premium models come with 5-year warranties. As NICEIC registered electricians covering Muswell Hill N10, N10, if you experience any issues with the installation, we’ll return promptly to resolve them at no additional cost during the guarantee period.”
}
},
{
“@type”: “Question”,
“name”: “What if my driveway is far from my consumer unit?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Standard installation includes up to 5m cable run (15m for premium packages). For longer distances, we install armoured cable via external walls, underground ducting, or through garages. During the free site survey, we’ll measure the exact route and provide transparent pricing for any additional cabling required.”
}
},
{
“@type”: “Question”,
“name”: “How do I book an EV charger installation?”,
“acceptedAnswer”: {
“@type”: “Answer”,
“text”: “Call us or use our online booking form. We’ll arrange a free site survey at a convenient time, assess your property’s electrical capacity, discuss charger options and features, and provide a detailed fixed-price quote with no obligation. Most installations are completed within 1-2 weeks of survey.”
}
}
]
},
{
“@context”: “https://schema.org”,
“@type”: “Service”,
“@id”: “https://www.rudielectrics.com/ev-charger-installation-muswell-hill#service”,
“name”: “EV Charger Installation Muswell Hill”,
“description”: “Professional 7kW smart EV charger installation in Muswell Hill N10, N10. Free site survey, fixed prices, full certification, DNO notification and 12-month workmanship guarantee. NICEIC registered electricians.”,
“url”: “https://www.rudielectrics.com/ev-charger-installation-muswell-hill”,
“serviceType”: “EV Charger Installation”,
“provider”: {
“@type”: “Electrician”,
“@id”: “https://www.rudielectrics.com/#business”,
“name”: “Rudi Electrics”,
“image”: “https://www.rudielectrics.com/wp-content/uploads/rudi-electrics-logo.png”,
“telephone”: “+447932772050”,
“priceRange”: “u00a3u00a3”,
“address”: {
“@type”: “PostalAddress”,
“streetAddress”: “22 Harington Terrace”,
“addressLocality”: “Muswell Hill”,
“addressRegion”: “London”,
“postalCode”: “N10 1JX”,
“addressCountry”: “GB”
},
“url”: “https://www.rudielectrics.com/”
},
“areaServed”: [
{
“@type”: “City”,
“name”: “Muswell Hill”,
“description”: “Muswell Hill N10, N10, London”,
“containedIn”: {
“@type”: “AdministrativeArea”,
“name”: “London Borough of Haringey”
},
“geo”: {
“@type”: “GeoCoordinates”,
“latitude”: 51.5898,
“longitude”: -0.1451
}
}
],
“offers”: {
“@type”: “Offer”,
“priceCurrency”: “GBP”,
“price”: “1499”,
“priceSpecification”: {
“@type”: “UnitPriceSpecification”,
“price”: “1499”,
“priceCurrency”: “GBP”,
“unitText”: “from, per installation”
}
}
},
{
“@context”: “https://schema.org”,
“@type”: “BreadcrumbList”,
“itemListElement”: [
{
“@type”: “ListItem”,
“position”: 1,
“name”: “Electrician North London”,
“item”: “https://www.rudielectrics.com/”
},
{
“@type”: “ListItem”,
“position”: 2,
“name”: “EV Charger Installation North London”,
“item”: “https://www.rudielectrics.com/ev-charger-installation-north-london/”
},
{
“@type”: “ListItem”,
“position”: 3,
“name”: “EV Charger Installation Muswell Hill”
}
]
},
{
“@context”: “https://schema.org”,
“@type”: “ServicePage”,
“@id”: “https://www.rudielectrics.com/ev-charger-installation-muswell-hill/#webpage”,
“url”: “https://www.rudielectrics.com/ev-charger-installation-muswell-hill/”,
“name”: “Ev Charger Installation Muswell Hill”,
“isPartOf”: {
“@id”: “https://www.rudielectrics.com/#website”
},
“breadcrumb”: {
“@id”: “https://www.rudielectrics.com/ev-charger-installation-muswell-hill/#breadcrumb”
},
“inLanguage”: “en-GB”,
“potentialAction”: {
“@type”: “ReadAction”,
“target”: [
“https://www.rudielectrics.com/ev-charger-installation-muswell-hill/”
]
},
“provider”: {
“@id”: “https://www.rudielectrics.com/#business”
},
“about”: {
“@id”: “https://www.rudielectrics.com/ev-charger-installation-muswell-hill/#service”
}
}
]
.re-final-cta-ev {
background: #234897 !important;
padding: 60px 0 !important;
position: relative !important;
overflow: hidden !important;
margin: 0 !important;
}
.re-final-cta-ev * {
box-sizing: border-box !important;
}
.re-final-cta-ev-inner {
max-width: 1400px !important;
margin: 0 auto !important;
padding: 0 60px !important;
text-align: center !important;
position: relative !important;
z-index: 2 !important;
}
.re-final-cta-ev h2 {
font-size: 48px !important;
font-weight: 800 !important;
color: #ffffff !important;
margin-bottom: 20px !important;
line-height: 1.2 !important;
}
.re-final-cta-ev h2 span {
color: #ffd700 !important;
}
.re-final-cta-ev .re-subheadline {
font-size: 20px !important;
color: rgba(255,255,255,0.95) !important;
max-width: 800px !important;
margin: 0 auto 35px !important;
line-height: 1.7 !important;
}
.re-final-cta-ev .re-benefits-strip {
display: flex !important;
justify-content: center !important;
gap: 40px !important;
flex-wrap: wrap !important;
margin-bottom: 40px !important;
padding: 25px !important;
background: rgba(255,255,255,0.1) !important;
border-radius: 16px !important;
backdrop-filter: blur(10px) !important;
}
.re-final-cta-ev .re-benefit {
display: flex !important;
align-items: center !important;
gap: 12px !important;
color: #ffffff !important;
}
.re-final-cta-ev .re-benefit-icon {
font-size: 28px !important;
color: #ffd700 !important;
}
.re-final-cta-ev .re-benefit-text {
font-size: 14px !important;
font-weight: 600 !important;
}
.re-final-cta-ev .re-cta-buttons {
display: flex !important;
gap: 20px !important;
justify-content: center !important;
flex-wrap: wrap !important;
margin-bottom: 30px !important;
}
.re-final-cta-ev .re-btn {
display: inline-flex !important;
align-items: center !important;
justify-content: center !important;
gap: 12px !important;
padding: 22px 45px !important;
border-radius: 14px !important;
font-weight: 800 !important;
font-size: 20px !important;
text-decoration: none !important;
transition: all 0.3s ease !important;
min-width: 260px !important;
}
.re-final-cta-ev .re-btn svg {
width: 24px !important;
height: 24px !important;
flex-shrink: 0 !important;
}
.re-final-cta-ev .re-btn-call {
background: #ffd700 !important;
color: #1a1a1a !important;
box-shadow: 0 8px 30px rgba(255,215,0,0.4) !important;
}
.re-final-cta-ev .re-btn-call:hover {
transform: translateY(-3px) !important;
box-shadow: 0 12px 40px rgba(255,215,0,0.5) !important;
text-decoration: none !important;
}
.re-final-cta-ev .re-btn-book {
background: rgba(255,255,255,0.15) !important;
color: #ffffff !important;
border: 2px solid rgba(255,255,255,0.3) !important;
backdrop-filter: blur(10px) !important;
}
.re-final-cta-ev .re-btn-book:hover {
background: rgba(255,255,255,0.25) !important;
transform: translateY(-3px) !important;
text-decoration: none !important;
}
.re-final-cta-ev .re-trust-elements {
display: flex !important;
justify-content: center !important;
gap: 30px !important;
flex-wrap: wrap !important;
color: rgba(255,255,255,0.9) !important;
font-size: 15px !important;
}
.re-final-cta-ev .re-trust-item {
display: flex !important;
align-items: center !important;
gap: 8px !important;
}
.re-final-cta-ev .re-trust-icon {
font-size: 20px !important;
color: #ffd700 !important;
}
@media (max-width: 768px) {
.re-final-cta-ev-inner {
padding: 0 20px !important;
}
.re-final-cta-ev h2 {
font-size: 32px !important;
margin-bottom: 16px !important;
}
.re-final-cta-ev .re-subheadline {
font-size: 17px !important;
margin-bottom: 25px !important;
}
.re-final-cta-ev .re-benefits-strip {
flex-direction: column !important;
gap: 12px !important;
padding: 20px !important;
margin-bottom: 30px !important;
}
.re-final-cta-ev .re-benefit-text {
font-size: 15px !important;
}
.re-final-cta-ev .re-cta-buttons {
flex-direction: column !important;
gap: 15px !important;
}
.re-final-cta-ev .re-btn {
width: 100% !important;
max-width: 400px !important;
padding: 18px 30px !important;
font-size: 18px !important;
}
.re-final-cta-ev .re-trust-elements {
flex-direction: column !important;
gap: 12px !important;
font-size: 14px !important;
}
}
@media (max-width: 420px) {
.re-final-cta-ev h2 {
font-size: 28px !important;
}
}
Need an EV Charger Installed in Muswell Hill?
Professional EV charger installation across Muswell Hill N10, N10 and all surrounding North London areas including Muswell Hill, Enfield, Palmers Green, Southgate, Wood Green, and more. Free site survey, fixed prices, fully certified.