Fuse Box / Consumer Unit Replacement Hackney
Tripping circuits in a Stoke Newington Victorian terrace, no-RCD landlord EICR fail in Clapton, or a converted Hackney Wick warehouse needing a proper consumer unit? We replace fuse boxes across the London Borough of Hackney — FuseBox or Wylex RCBO boards, Type 2 SPD, full BS 7671 18th Ed Amendment 2 certification.
Why Choose Rudi Electrics
for Fuse Box / Consumer Unit Replacement in Hackney?
Your concerns answered — here’s why Hackney homeowners and landlords trust us for fuse box replacement and consumer unit upgrades.
“Will I get a fixed price or surprise extras?”
Fixed price quote after a free survey. We check incoming supply, earthing, circuits and HMO requirements before quoting — the figure you see is the figure you pay. Standard 5–7 way RCBO board from £800; 8–12 way premium boards from £950; 16+ way large-property boards from £1,200.
“How long will my power be off?”
Most installs are completed in 3–4 hours with a single short power-off window. We pre-run new tails, isolate at the main switch, swap the board, and re-energise circuit-by-circuit while testing. Fridge / freezer planning is part of the survey conversation, not a surprise on the day.
“Are you fitting a quality unit, not a cheap import?”
Only FuseBox, Wylex, Hager or Schneider consumer units — never unbranded imports. Type A or AC RCBOs as required, Type 2 SPD as standard, and AFDDs on bedroom circuits where landlord HMO compliance requires it. All BS EN 61439-3 listed.
“Will it pass building control and EICR?”
Every install is notified to Building Control through our NICEIC registration (D609991) and you receive a full BS 7671 18th Edition Amendment 2 Electrical Installation Certificate within 24 hours. Insurer-accepted, mortgage-accepted, and remedial-friendly for any future EICR.
Fuse Box / Consumer Unit Replacement Across the Borough of Hackney
Hackney’s housing is some of the densest and most varied in London: Victorian terraces across Hackney Central, Stoke Newington, Clapton and London Fields, Georgian and early-Victorian in Hoxton, Shoreditch and De Beauvoir, ex-LCC estates across Homerton, Haggerston and large parts of Hackney Central, and converted industrial in Hackney Wick and Dalston. The HMO density in N16 and E5 is among the highest in London.
Most common Hackney jobs: HMO licensing-driven replacements across N16 and E8 (Hackney runs borough-wide additional licensing), landlord EICR remedials on pre-1990s Clapton and Homerton stock, and load-side upgrades on converted warehouses in Hackney Wick where developer specs are already at limit.
Boards we typically install across Hackney: FuseBox 10–12 way RCBO for the standard mid-terrace conversion, per-flat AFDD boards for HMOs in N16 / E8 / E9, and 16+ way RCBO + SPD for the larger De Beauvoir and Victoria Park villas.
What Our Customers Say About Us
Real reviews from homeowners and landlords across Hackney and the wider London Borough of Hackney. Live Google reviews below — for all reviews across platforms, see our testimonials page →
Our Fuse Box / Consumer Unit Installations
Real jobs completed across North London — FuseBox & Wylex RCBO boards, fully certified.
Book Your Free Fuse Box / Consumer Unit Survey
Tell us about your Hackney property and we’ll arrange a free no-obligation survey — fixed price quote within 24 hours.
NICEIC Registered
All installs by an NICEIC Registered electrician (D609991) — fully BS 7671 18th Ed Amendment 2 compliant and accepted by mortgage lenders, insurers and Building Control.
Fixed Price Quote
Free site survey, fixed-price quote within 24 hours — no hourly billing, no surprise extras. From £800 standard, £950 premium, £1,200 large boards.
Same-Day Install
Most fuse box replacements completed in 3–4 hours on the day. Power back on the same evening with a single short isolation window.
From £800
Standard 5–7 way RCBO board from £800. Premium 8–12 way from £950. 16+ way large-property boards from £1,200. HMO compliance pack quoted bespoke.
🔒 Your details are kept private and never shared. We'll call within 24 hours.
Signs Your Hackney Property Needs a New Fuse Box / Consumer Unit
Six tells we look for in Hackney fuse-box surveys. If two or more apply, a board replacement is usually the right call — not a repair.
Tripping that won’t reset
If your RCD trips and resets briefly then drops again the same evening, that’s a fault on a circuit — not a fuse box that just “needs a swap”. We isolate it during the install so the new board doesn’t inherit the same fault.
Burning smell or scorch marks
Brown discolouration around the main switch or burning plastic smell from the meter cupboard means heat damage at the consumer unit. Stop using high-load appliances and call us — this is a same-day priority job.
Wirewound or rewireable fuses
Old porcelain fuse holders with rewireable wire, or cartridge fuses with no MCBs at all, mean the board is from before 1980 and has zero RCD protection. EICR will fail it on C2; insurers may refuse claims.
Failed EICR or insurer refusal
C1 or C2 codes for “no RCD on socket circuits”, “outdated consumer unit”, or “non-compliant with current standards” are all board-level fixes. Send us the EICR and we’ll quote remedial work without a survey.
HMO licensing inspection
Council HMO licensing now requires AFDDs on bedroom circuits (BS 7671 Amendment 2). If your existing board has no AFDDs and you’re renewing a licence, the inspection will flag it. Per-flat boards with AFDD are the standard fix.
Frequent appliance damage
If your TV, fridge, or boiler PCB has died more than once in the last few years, that’s typically a Type 2 SPD problem — older boards have no surge protection. New install adds SPD as standard.
How We Replace Your
Fuse Box / Consumer Unit
Professional install from start to finish. Most fuse box replacements complete in 3-4 hours with minimal disruption to your home.
Initial Assessment
We check your incoming supply, earthing arrangement (TT vs TN-C-S), circuit count, RCD/SPD status, EICR history if any, and confirm whether AFDDs are required (HMO sleeping rooms). The survey is free with no obligation and you get a written fixed-price quote within 24 hours.
Isolation & Removal
DNO main fuse pulled with permission, existing tails isolated, old board removed cleanly. We cap and label every circuit before disconnecting so reconnection is methodical, not guesswork. No live working at any stage.
New Unit Installation
Modern consumer unit (FuseBox, Wylex, Hager or Schneider) fitted with new 25mm meter tails, 100A main switch, full RCBO protection per circuit, Type 2 SPD on the main bus, and AFDDs where required. Cables labelled and torque-checked.
Testing & Verification
Full BS 7671 testing: insulation resistance (every circuit), Zs / Ze loop impedance, RCD trip times, SPD verification, polarity checks, and earth fault path. Any pre-existing fault is logged and discussed before we re-energise.
Fault Finding (If Needed)
If a circuit fails testing on the new board (typically a hidden borrowed neutral or insulation breakdown on an existing run), we find and fix it the same day where possible. Most fixes add £80–£180; major issues are quoted before any extra work starts.
Certification & Handover
Electrical Installation Certificate issued, photographed install record, written labels inside the board, Building Control notification through our NICEIC registration, and a verbal walkthrough of the new RCBOs and SPD test buttons. 12-month workmanship guarantee starts on handover.
Fuse Box / Consumer Unit Replacement Pricing
Quick reference for Hackney homeowners. Fixed quotes given after a free site survey.
- ✓ New RCBO / Dual RCD consumer unit
- ✓ 100A main switch & 25mm meter tails
- ✓ Type 2 SPD surge protection
- ✓ Full BS 7671 testing & certification
- ✓ 12-month workmanship guarantee
- ★ 8–12 way full RCBO board
- ★ Individual circuit protection
- ★ Type 2 SPD & 100A main switch
- ★ FuseBox / Wylex / Hager premium unit
- ★ Priority install scheduling
- ✓ 16+ way full RCBO board
- ✓ Individual circuit protection
- ✓ Type 2 SPD & 100A main switch
- ✓ Full circuit schedule documentation
- ✓ 12-month workmanship guarantee
Fuse Box / Consumer Unit Replacement Hackney — Across All Property Types
From Edwardian semis on Barnet’s ridge to modern Mill Hill detached homes and Friern Barnet HMO conversions — we replace fuse boxes across every Hackney property type. Each comes with its own electrical quirks, and we know what to look for.
Victorian Terraces & Conversions
📍 Stoke Newington, Clapton, London Fields, Hackney Central
Pre-1980 fuse boards in flats split off larger terraces. No RCD. Shared earthing arrangements between flats. Borrowed neutrals on staircase lighting. Tenants unable to identify which board is theirs.
Per-flat RCBO board with dedicated metering, full earthing separation, labelled board, SPD as standard. EICR re-test on completion.
Georgian & Early-Victorian
📍 Hoxton, Shoreditch, De Beauvoir, Haggerston
Listed-building constraints on cable routing. Period sash-window casements with hidden cable runs. Original timber wall panelling. Shared chimney-breast bonding issues.
Conservation-aware install: surface conduit in heritage colours where wall chasing isn’t allowed, preservation of period switch positions, full TN-C-S where DNO permits.
Ex-LCC Estates
📍 Homerton, Haggerston, Hackney Central
1960s aluminium-tailed Wylex boards. Block-shared earthing with rising-main faults. Corroded MET. EICR failures on landlord licensing.
Per-flat RCBO board, copper tail replacement, dedicated bonding to flat’s services, Type 2 SPD on the main bus.
HMO Conversions & Hackney Wick
📍 Hackney Wick, Dalston, Stoke Newington HMOs
Heavy HMO conversion stock. No AFDDs on bedrooms. Developer warehouse conversions with under-spec boards. Communal landing lighting on tenant meters.
Per-flat consumer units with AFDDs, communal-area circuits on landlord supply, BS 5839-6 alarm interface, EI4 emergency lighting. Full HMO pack ready for Hackney Council licensing.
Need a fuse box upgrade for your Hackney property?
Fuse Box / Consumer Unit Replacement Across Hackney — All Sub-Areas
Same-week site surveys across the London Borough of Hackney. Click your area for the local landing page, or call 07932 772050.
Fuse Box / Consumer Unit Replacement Hackney FAQs
Clear answers to the most common questions Hackney homeowners and landlords ask about fuse box replacement, consumer unit upgrades, EICR-driven installs, and HMO compliance.
For official guidance, visit Electrical Safety First or read the Building Regulations guidance.
Do you cover the full London Borough of Hackney for fuse box replacement? ▼
Yes — we cover Hackney Central, Stoke Newington, Dalston, Hoxton, Shoreditch, Homerton, Clapton, London Fields, Victoria Park, Haggerston, De Beauvoir and Hackney Wick. E2 / E5 / E8 / E9 / N1 / N16 postcodes all served from our Edmonton base.
What does Hackney Council require for an HMO consumer unit? ▼
Hackney runs borough-wide additional HMO licensing — one of the most stringent in London. Electrical requirement is full BS 7671 18th Ed Amendment 2: AFDDs on every bedroom circuit, RCBO per circuit, per-flat board on multi-let, 5-yearly EICR. We do the full HMO pack including BS 5839-6 alarm interface and EICR at handover suitable for licensing.
Can you work on listed Georgian properties in Hoxton / De Beauvoir without damaging period features? ▼
Yes — conservation-area and listed-building work is most of what we do in N1 / E2. We use surface conduit in heritage colours, preserve original switch positions, route around timber panelling, and never chase walls in listed properties without listed-building consent. Survey conversation always covers what features matter to you.
How fast can you respond for emergency fuse box failure in Hackney? ▼
Typically 2–4 hours daytime across the borough, longer in evenings. We carry FuseBox / Wylex stock for same-day installs. For total power loss or burning smell, call 07932 772050 — we’ll confirm an arrival time within 30 minutes.
How long does a fuse box replacement actually take? ▼
For a standard domestic install, plan for 3–4 hours on site from arrival to handover, with a single power-off window of about 90 minutes during the swap itself. Larger 16+ way boards or HMO installs with AFDDs run closer to 5–6 hours.
Same-day completion is standard. We don’t leave a job overnight without a working board.
Do I really need to replace my fuse box, or can you just fix the tripping? ▼
Honest answer: it depends on the board. If you have a rewireable or wirewound fuse box (no MCBs or RCDs), or a board with no RCD protection on socket circuits — that’s a replacement, not a repair. BS 7671 18th Edition requires RCD on every circuit feeding sockets and now AFDDs on HMO bedroom circuits.
If you have a modern board with RCBOs and a single circuit is tripping, that’s usually one faulty circuit or appliance — we fault-find and fix that, no replacement needed. The free survey will tell you which it is.
Will my install need a full rewire too, or is it just the board? ▼
Most installs we do are board-only — the existing wiring is sound, just the board is past its life. We test every circuit during installation; if one fails (usually a hidden borrowed neutral or insulation breakdown), we either fix it the same day or quote it separately.
If multiple circuits fail testing, that’s when a partial or full rewire conversation happens. We tell you straight, with the failure data in front of you. No upselling.
Will my new board pass an EICR or insurance inspection? ▼
Yes — every install is to BS 7671 18th Edition Amendment 2, notified to Building Control through our NICEIC registration (D609991), and certified with a full Electrical Installation Certificate within 24 hours.
The certificate is accepted by mortgage lenders, home insurers, landlord licensing schemes, and any future EICR will treat the board itself as satisfactory — only existing-circuit issues from before our work would code on a future inspection.
Need a Fuse Box / Consumer Unit Replacement
in Hackney?
Professional fuse box replacement and consumer unit installation across the London Borough of Hackney including Hackney Central, Stoke Newington, Dalston, Hoxton, Shoreditch, Homerton and surrounding areas. Free site survey, fixed prices, fully certified BS 7671 18th Ed Amendment 2.





























