01
Condition
Is anything damaged, loose or overheating?
Physical damage, signs of heat or unsafe access need direct assessment. Cosmetic age alone is a different issue.
An older board is not condemned by colour or age alone. Replacement becomes justified when the existing equipment, protection, condition or planned work cannot provide a suitable completed installation.
NICEIC-Registered Electrician D609991 · 15+ Years on the Tools · 388+ Reviews Across Platforms · 12-Month Workmanship Guarantee
Assess the installation, not the photograph alone
Replacement may be appropriate where the enclosure or devices are damaged, essential protective measures are absent, the equipment is unsuitable for planned alterations or a safer maintainable arrangement cannot be achieved. Existing circuits still need testing before they are transferred to a new consumer unit.
Start with the property, not the product
The consumer unit is the origin of the installation, but it cannot correct every defect downstream.
Swipe through the four questions
01
Condition
Physical damage, signs of heat or unsafe access need direct assessment. Cosmetic age alone is a different issue.
02
Protection
RCD type, circuit grouping, protective devices and surge-protection decisions must be considered against the installation and intended work.
03
Circuits
A new board can reveal insulation, continuity or borrowed-neutral faults when circuits are individually protected and tested.
04
Alterations
New circuits or major alterations may change capacity, ways, isolation and protective-device requirements.
A practical decision guide
A recommendation should connect the present condition and planned work to the proposed design.
Urgent assessment
The immediate concern is making the installation safe. The final repair or replacement follows inspection of the affected equipment and circuits.
Planned replacement
A designed upgrade can provide an appropriate arrangement for verified circuits and planned work, with testing and documentation included.
May remain
Age or a plastic enclosure does not automatically mean immediate replacement. An inspection can distinguish improvement recommendations from defects.
Wider work
Broken rings, poor insulation, missing conductors or unsuitable alterations require circuit-level remedial work as well as any consumer-unit decision.
What professional work looks like
The survey and pre-work checks reduce surprises and define the quotation.
Confirm the incoming arrangement, service equipment, main earthing and protective bonding relevant to the work.
Review schedules, circuit count, existing protection and visible signs of alteration or damage.
Check circuit condition so faults can be explained and priced rather than hidden behind the new enclosure.
Select the enclosure, ways, isolation and protective devices from the verified installation.
Complete the applicable inspection, schedules, Electrical Installation Certificate and Building Regulations notification.
Experience made visible
The customer should receive a clear circuit schedule, test results and the applicable certification—not simply a photograph of a tidy board.
This guide explains the practical issues customers ask about. Regulations and official guidance can change, and the correct solution still depends on the property. The following primary sources were checked when this page was prepared:
Straight answers to the questions customers ask before arranging a survey or inspection.
Not solely because it is plastic. Condition, location, protection and the wider installation determine whether replacement is required or recommended. A competent inspection should distinguish those conclusions.
Not if an underlying circuit or appliance fault remains. Testing should identify existing defects; a new protective device may reveal faults that older arrangements did not detect in the same way.
A consumer-unit replacement includes inspection and testing relevant to the work and an Electrical Installation Certificate. Where the wider installation condition is uncertain, a separate EICR may also be recommended, but the documents serve different purposes.
Consumer-unit replacement in a dwelling is notifiable work in England. The installer should explain the certification and notification route included in the quotation.
Send the property details and, if useful, a photograph of the existing board after submitting. We test the existing installation before confirming the design.
We inspect the property and existing installation before specifying work.
The quotation separates verified work from assumptions and optional improvements.
The completed work is tested and documented for its actual scope.
You know what is included, what remains and who controls the finished system.