01
Condition report
EICR
An Electrical Installation Condition Report records the condition of the existing fixed installation at the time of inspection and identifies observations, classifications and any required further investigation.
Landlords need more than a certificate in a folder. This guide explains the inspection cycle, report delivery, remedial-work deadlines and the difference between an EICR, installation certificate and ordinary visual checks.
Qualified Electrician Report · NICEIC-Registered Electrician D609991 · 388+ Reviews Across Platforms · Clear Remedial Evidence
Current England guidance, translated into a working checklist
In England, landlords covered by the electrical safety regulations must have the fixed electrical installation inspected and tested by a qualified person at least every five years, obtain the report, provide the required copies and complete identified remedial or further investigative work within 28 days—or sooner if the report specifies a shorter period.
Start with the property, not the product
Confusion usually begins when every electrical document is called a “certificate”. The record must match what was actually inspected, installed or repaired.
Swipe to compare the situations
01
Condition report
An Electrical Installation Condition Report records the condition of the existing fixed installation at the time of inspection and identifies observations, classifications and any required further investigation.
02
New installation work
An Electrical Installation Certificate records new installation work such as a replacement consumer unit or new circuits. Current government guidance recognises appropriate installation certification in relevant circumstances.
03
Smaller alterations
A Minor Electrical Installation Works Certificate may record suitable minor additions or alterations that do not include a new circuit. It is not a substitute for an EICR of the property.
04
Between formal checks
A pre-tenancy visual check is sensible for damage or deterioration, but it does not replace the formal inspection and testing required when the report is due or safety concerns justify earlier testing.
A practical decision guide
A landlord or agent should be able to answer four questions quickly: what was inspected, when the next inspection is due, what work was required and which tenant received which record.
Before occupation
Where a valid report already exists and no earlier inspection is required, provide that report before the tenant occupies the property. A new EICR is not automatically needed for every new tenancy.
After inspection
Provide the report to the existing tenant within the required period and do not treat delivery as the end of the process. Classifications and recommendations determine the next action.
When work is required
Required remedial or further investigative work must be completed within 28 days or any shorter period stated in the report, with written confirmation retained and supplied as required.
Before the next due date
Damage, deterioration, tenant reports, alterations or an inspector-specified shorter interval may justify earlier inspection. Five years is a maximum interval, not a promise that nothing needs attention in between.
What professional work looks like
The inspection is technical; the handover should still be understandable to the person responsible for the property.
Review the address, tenancy context, previous report, certificates and any reported faults or changes since the last inspection.
Plan access to the consumer unit, circuits, accessories and relevant areas, and record any genuine operational limitations rather than implying that inaccessible items were inspected.
Assess the fixed installation, record test results and use the recognised classifications consistently, including any need for further investigation.
Separate immediate danger, potentially dangerous issues, further investigation and recommendations so the landlord knows what action is actually required.
Retain the report, invoices and appropriate electrical certification or written confirmation for completed work, then update the next due date and tenant record.
Experience made visible
The useful file connects the property, inspection, observations, remedial work, tenant delivery and next due date. That protects the tenant and makes the next inspection or change of tenancy much easier to manage.
This guide explains the practical issues customers ask about. Regulations and official guidance can change, and the correct solution still depends on the property. The following primary sources were checked when this page was prepared:
Current England requirements explained in practical language. This is general information, not legal advice for a disputed or unusual tenancy.
At least every five years, or sooner where the previous report specifies a shorter interval or there is reason to believe the installation may no longer be safe. Check the current GOV.UK guidance for the tenancy concerned.
Not automatically. Current government guidance says a new inspection is not required simply because the property is re-let when a valid report completed less than five years ago remains suitable and does not require outstanding work. The new tenant must receive the current report before occupation.
Where the report requires remedial or further investigative work, the regulations generally require completion within 28 days or any shorter period specified as necessary in the report.
An EICR concerns the fixed electrical installation. Appliances supplied with the tenancy are a separate responsibility and may require their own checks or records depending on the landlord, sector and applicable guidance.
No. The material alone does not automatically determine the report outcome. The inspector assesses the installation against the current reporting guidance, including condition, signs of thermal damage, protection and the circumstances of the installation.
The landlord must retain the report and provide copies in the situations and timeframes set out in the regulations, including to tenants and to the local housing authority when requested. Use the current GOV.UK guidance for the exact duty.
Tell us about the property, current report and due date. We provide qualified inspection, clear classifications and the evidence needed to close remedial work properly.
Inspection and testing are recorded against the correct property and installation.
Required action is separated from recommendations and explained in practical language.
Completed work is matched to the observations with appropriate electrical records.
The landlord can see what was done, what remains and when the next inspection is due.