Rewiring & Electrical Certificates
for House Sale North London

Buyer’s solicitor flagged electrical? Most sellers just need a clean EICR (from £180) — a few need targeted remedials, fewer still need a full rewire. We’re the conveyancing-speed electricians for North London: solicitor-ready certificate packs, surveyed within 48 hours, delivered before exchange.

NICEIC Registered Electrician · 48-Hour Pre-Sale Survey · Solicitor-Ready Certificate Pack · 5-Star Rated on Google

Electrical Problems We Solve Before a House Sale

We establish whether you need an EICR, targeted remedial work or a wider rewiring scope, then provide the appropriate documentation for the agreed work.

What Our Customers Say About Us

Real reviews from homeowners across North London. Live Google reviews below — for all 388+ reviews across Google, Checkatrade and MyBuilder, see our testimonials page →

Book Your Free Conveyancing Call-Out

Tell us where you’re at in the conveyancing process and we’ll arrange a free pre-sale electrical survey — fixed price, all certs to your solicitor.

🎖

NICEIC Registered

All certificates issued by an NICEIC-Registered electrician — fully BS 7671 18th Edition compliant, accepted by every conveyancing solicitor and mortgage lender we’ve dealt with.

48-Hour Survey

Pre-sale survey booked within 48 hours of your call. Written EICR within 5 working days. Targeted to conveyancing timelines, not generic install schedules.

📑

Solicitor-Ready Pack

EICR, EICs, Part P retrospective lodgement, D1 alarm declaration, covering letter — all packaged as PDFs and posted originals direct to your conveyancer.

💰

From Β£180

EICR-only from £180 (1–2 bed flat), £230 (3-bed). Targeted remedials £950–£3,200. Always quoted upfront before any work begins.

Sending your enquiry…

πŸ”’ We use your information to handle your enquiry and related records. Any optional advertising measurement requires your separate permission; see our Privacy Policy. We'll respond during working hours.

βœ“

Pre-Sale Survey Request Sent!

Thanks — we'll contact you during working hours to confirm the survey visit and discuss your conveyancing timeline.

Five Things Your Buyer’s Solicitor Will Ask For

Conveyancing electrical requests follow a predictable pattern. Here are the five that come up on almost every North London sale — and what to do if you don’t have them yet.

📋

Valid EICR (within last 5 years, no outstanding C1 or C2 codes)

The single most common conveyancing ask. The buyer’s solicitor wants a satisfactory EICR dated within the last 5 years — that’s the standard. If yours is expired, missing, or flags unfixed C1/C2 codes, you’ll need either a fresh inspection or remedial work plus a re-test. We turn most pre-sale EICRs around in 5 working days. If C1/C2 codes come back, we quote remedial work and re-test on the same visit so the final cert is clean. See EICR North London for full scope.

EIC for any work done since the last EICR

If you’ve had an extension, a new kitchen, a consumer unit replacement, or a bathroom redone since the last inspection, the solicitor wants the Electrical Installation Certificate (EIC) for that specific job. Solicitors check for parallel work that should have its own paperwork. Missing EICs are a common reason exchange gets delayed by 2–4 weeks. If the original electrician didn’t leave you a copy, we can issue a retrospective EIC after a brief inspection of the work in question.

🏠

Building Control completion certificate (Part P) for post-2005 notifiable work

Anything notifiable under Part P done since 2005 needs a Building Control completion certificate — consumer unit replacement, kitchen rewire, bathroom or wet-zone work, dedicated high-load circuit installation. If your previous electrician didn’t lodge the notification, you need a retrospective certificate now before the sale completes. As NICEIC-registered installers, we self-certify and issue the Part P notification on your behalf. Typical lodgement turnaround 5–10 working days. See consumer unit work we’ve handled.

🔥

Smoke and heat alarm Grade D1 declaration

Many London councils now require evidence of mains-wired interconnected smoke alarms (Grade D1, BS 5839-6) before sale completion — a standard ask post-2022 across Greater London. Battery-only alarms or older standalone mains units don’t pass the check. For most North London properties this is a 1-day install: smoke detectors on every storey, heat detector in the kitchen, all interconnected, all backed up by sealed lithium cells. We issue the D1 declaration on completion and forward it to your solicitor.

🔌

Confirmation of fuse-box compliance with current regs

If your consumer unit pre-dates BS 7671:2008 — rewireable fuse box, MCB-only board with no RCD protection, or a metal-cased older unit — the buyer’s solicitor will flag it. Either a fuse-box replacement with full RCBO protection or, in rare listed-building cases, a written technical justification is needed. A standard pre-sale fuse-box upgrade runs £800–£1,200, takes one working day, and clears the most common single objection on conveyancing.

How We Get Your Sale Across The Line

From the moment your solicitor flags an issue to the moment your conveyancer receives the cert pack — here’s the conveyancing-paced workflow we run for North London sellers.

48 hr
Survey Booking
5 days
EICR Turnaround
2–3 wks
Full Cert Pack
£180
From (1–2 bed EICR)

Pre-Sale Electrical Pricing

Quick reference for North London property sales. Fixed quotes given after a free site survey — remedial work always priced upfront before exchange.

Pre-Sale Electrical Work North London — Across All Property Types

Every North London property type has its own conveyancing electrical quirks. Here’s what we typically find at pre-sale survey, and how we fix it inside the exchange window.

Swipe to explore all property types

Selling a property in North London? Get the cert pack your solicitor needs.

Pre-Sale Electrical Across 8 North London Boroughs

Same-week pre-sale surveys across the eight North London boroughs we serve. Select your borough for local service guidance, or call 07932 772050.

Pre-Sale Rewiring FAQs for North London Sellers

Clear answers for homeowners selling and the estate agents referring them — conveyancing electrical questions that come up most often on North London property sales.

My buyer's solicitor has asked for an EICR — what is it and how quickly can I get one?

An Electrical Installation Condition Report (EICR) is a formal inspection of the wiring in a property, issued by a qualified electrician, that grades each part of the installation as satisfactory or codes any defects (C1 immediate danger, C2 potentially dangerous, C3 improvement recommended). Conveyancing solicitors ask for one to confirm the wiring is safe before the buyer commits.

Most pre-sale EICRs we book are surveyed within 48 hours of the call, with the written report issued within 5 working days. Pricing starts at £180 for a 1–2 bed flat or £230 for a typical 3-bed. See our EICR cost guide for a fuller breakdown.

How long does the full pre-sale process take from first call to cert pack delivered?

For an EICR-only job with no remedials needed: about 5–7 working days from your call to your solicitor receiving the PDF and posted original.

For an EICR plus targeted remedial work: typically 2–3 weeks end-to-end — survey within 48 hours, EICR within 5 days, remedial work booked 7–14 days later, re-test and fresh cert issued same-day, full pack to solicitor within another 24 hours.

If your exchange date is tight, tell us at the first call — we’ve cleared exchange-ready in under 10 days when the deadline was hard.

What's the difference between EICR, EIC, and Part P Building Regulations Compliance Certificates — do I need all three?

They cover different things and conveyancing solicitors often ask for whichever applies:

  • EICR (Electrical Installation Condition Report) — periodic safety inspection of the existing installation. Recommended every 5 years for owner-occupied homes, every 5 years (or change of tenancy) for rentals.
  • EIC (Electrical Installation Certificate) — issued by an electrician when new circuits are installed. Required for any new work since the last EICR.
  • Part P Building Control certificate — required for notifiable work (consumer unit, kitchen, bathroom, other high-load equipment) done since 2005. Either lodged with Local Authority Building Control or self-certified by an NICEIC-registered installer.

You need whichever applies to the work history of your property. We issue all three when needed, and lodge Part P retrospectively if a previous installer didn’t.

If my EICR has C2 codes, do I have to fix them before exchange?

Almost always, yes — if you want a clean sale. A C2 code means “potentially dangerous” and the buyer’s solicitor will normally insist on either remedial work being completed before exchange, or a price reduction reflecting the cost.

The cheaper, cleaner route is to fix the C2 items, get a fresh satisfactory EICR, and exchange on your original price. Most C2 codes (missing RCD protection, borrowed neutrals, damaged insulation on a single circuit) cost £950–£3,200 to remedy, far less than the price drop a buyer’s solicitor would push for.

C3 codes are advisory only — you don’t need to fix them, though doing so can strengthen your position.

I had a kitchen/extension/consumer unit done years ago but I can't find the certificate — what now?

Common situation. Two routes:

  • If the original electrician is contactable — ask them for a copy. NICEIC-registered electricians keep records for 6 years minimum.
  • If not — we can issue a retrospective Electrical Installation Certificate after a brief inspection. The work has to be visible (consumer unit accessible, sockets and switches in place) and we test the relevant circuits to confirm compliance. For Part P retrospective lodgement, we file with Building Control on your behalf as NICEIC-registered installers.

Turnaround is typically 5–10 working days for retrospective Part P; same-day for an EIC if the work passes test.

The buyer's surveyor said the consumer unit is non-compliant — do I have to replace it?

Most likely, yes. If your consumer unit is a rewireable fuse box, a metal-cased older board, or any unit without RCD/RCBO protection on every circuit, it pre-dates the 2008 BS 7671 amendment and the buyer’s side will normally insist on replacement.

A pre-sale fuse-box upgrade typically runs £800–£1,200, takes one working day, and clears the most common single objection on conveyancing. We issue an EIC for the new board and Part P notification through Building Control. See our Consumer Units North London page for full scope.

Do I need mains-wired interconnected smoke alarms before I can sell in London?

For most London property sales post-2022, yes. Many councils now require evidence of Grade D1 mains-wired interconnected smoke alarms (BS 5839-6) before completion — smoke detectors on every storey, heat detector in the kitchen, all interconnected, all backed up by sealed lithium cells. Battery-only alarms or older standalone mains units don’t pass the check.

Installation is a 1-day job for most properties, and we issue the D1 declaration on completion to forward to your solicitor. If your property is a rental being sold with vacant possession, the requirement is identical.

Should I rewire the whole house before selling, or just do remedial work?

Almost always remedial / partial rewire work, not a full rewire. Most pre-sale electrical objections are one or two specific items — missing RCDs, borrowed neutrals, an unnotified consumer unit replacement — and targeted remedial work fixes those for £950–£3,200.

A full rewire (£4,500+) is rarely the right answer when you’re selling. The buyer benefits from a generic rewire less than they would from picking their own electrician for sockets, smart switches and lighting after they move in. Spend on the targeted fixes that clear the conveyancing objection, not on work the next owner won’t value at full cost.

The exception: pre-1960s wiring with no earth, cloth insulation throughout, multiple C1 codes — full rewire is genuinely needed. See our House Rewiring North London page for that scope, and the House Rewire Cost Guide for pricing.

Can the work be done while the property is empty / I've already moved out?

Yes — and it’s often the easiest way. If you’ve moved out and the property is empty pending exchange, we can hold a key, work through the day uninterrupted, and lock up. We send daily progress photos so you can confirm scope without needing to attend.

If the property is still occupied (your tenants, or you’re still living there during the sale), we work room-by-room and keep core services live each evening — fridge/freezer feed, lighting, Wi-Fi point. Most pre-sale remedial jobs run 1–3 days on site either way.

I'm an estate agent — can I refer a client and get a fast turnaround?

Yes — estate-agent referrals are a big chunk of this work. Pass the client’s number with the property address and we’ll call them within 4 working hours, book the survey within 48 hours, and keep you copied on the cert pack so you can pass it to the buyer’s side directly if you’re managing the chain.

We’ve worked alongside several North London independent agents on time-pressured sales — offer accepted, exchange in 4–6 weeks, electrical objection at week 2, sale completes on schedule. Call 07932 772050 to set up a referral channel for your office.

Need Pre-Sale Electrical Certs Before Exchange?

Honest, fixed-price quotes after a free pre-sale electrical survey. NICEIC-Registered, fully certified, full pack to your conveyancer before exchange. Covering all 8 boroughs across North London.

From £180 48-hour survey Solicitor-ready pack Conveyancing-paced
Call 07932 772050 Request free survey
5-Star Rated · Fully Insured · NICEIC D609991